Kentucky Statutes > Chapter 350 – Surface Coal Mining
Operations: means surface coal mining operations, all of the premises, facilities, roads, and equipment used in the process of producing coal from a designated area or removing overburden for the purpose of determining the loion, quality, or quantity of a natural coal deposit or the activity to facilitate or accomplish the extraction or the
Service EnterpriseVia Electronic Mail Small Business Administration
rule, which include surface mining activities that occur in the water such as mining through waters, placement of bridge abutments, construction of sedimentation pond embankments and construction of excess spoil fills and coal mine waste disposal facilities. Each of
Service EnterpriseSurface Mining Commission Chapter 880X10C ALABAMA
Surface Mining Commission Chapter 880X10C Supp. 3/31/13 10C1 ALABAMA SURFACE MINING COMMISSION ADMINISTRATIVE CODE CHAPTER 880X10C PERFORMANCE STANDARDS SURFACE MINING ACTIVITIES TABLE OF CONTENTS 880X10C.01 Scope 880X10C.02 Objectives 880X10C.03 Signs And Markers
Service EnterpriseCoal mining Wikipedia
Coal mining can result in a number of adverse effects on the environment. Surface mining of coal completely eliminates existing vegetation, destroys the genetic soil profile, displaces or destroys wildlife and habitat, degrades air quality, alters current land uses, and to some extent permanently changes the general topography of the area mined.
Service EnterpriseCOMPLAINT FOR DECLARATORY AND INJUNCTIVE RELIEF
COMPLAINT FOR DECLARATORY AND INJUNCTIVE RELIEF Introduction 1. This action seeks review of a final rule promulgated by the Office of Surface Mining ("OSM") for "Excess Spoil, Coal Mine Waste, and Buffers for Perennial and Intermittent Streams," 73 Fed. Reg. 75,814 (Dec. 12, 2008) ("stream buffer zone rule" or "SBZ rule"), and
Service EnterpriseOffice of Surface Mining Issues New Rule Tightening
Coal Mine Waste, and Mining Activities in or Near Streams (Washington) – The Office of Surface Mining Reclamation and Enforcement (OSM) announced publiion in the Federal Register today of a Federal rule that places new restrictions on how coal mine operators can dispose of coal mine waste and the excess spoil created by the mining operation.
Service EnterpriseSurface and underground mining activities: Excess spoil
More specifically, we intend to minimize the environmental effects from excess spoil fill construction by requiring that the coal operator demonstrate to the satisfaction of the regulatory authority that, to the extent possible, the volume of excess spoil is minimized excess spoil fills associated with a mine are designed to be no larger than
Service EnterpriseGAO10206 Surface Coal Mining: Financial Assurances for
SURFACE COAL MINING Financial Assurances for, and LongTerm Concerning the Creation and Disposal of Excess Spoil and Coal Mine Waste and Stream Buffer Zones, OSMEIS34 (2008). previous administration modified the rule to allow a surface coal mine operator to place excess spoil material excavated by the operation into streams if the
Service EnterprisePermanent Program Regulations for Coal Eduion
130 Disposal of excess spoil 140 Disposal of coal processing waste 150 Disposal of noncoal mine waste 160 Coal mine waste dams and impoundments 170 Stabilization of surface areas 180 Protection of fish, wildlife, and related environmental values 190 Backfilling and grading 200 Revegetation 210 Postmining land use capability 220 Roads
Service EnterpriseHydrologic Effects of Surface Coal Mining in Appalachia (U.S.)
The increased scale of surface mining in mountainous terrain often requires larger excess spoil disposal fills, such as valley fills (VFs), because of increased spoil volumes. This expanded scale of Appalachian mining operations (Haering et al., 2004 Copeland, 2013) and use of VFs to store excess spoil (Shank, 2010) have
Service EnterpriseChapter 2: The Environmental Effects of Strip Mining The
Despite its title, SMCRA''s provisions apply not only to surface mining, but also to the surface effects of underground mining. As a percentage of all coal mining, underground coal mining has been declining for many years, but in 2007 it still accounted for approximately 31 percent of coal mining, as compared with 69 percent surface mining.
Service EnterpriseDate: April 21, 1998 eec.ky.gov
activity, underground mine faceup areas, coal refuse piles or excess spoil disposal areas, coal preparation plants or coal loadout facilities, access roads, sediment control structures, and landslides or mine spoil pushed off the mine bench and loed below the coal seam outcrop.
Service EnterpriseChapter 2: The Environmental Effects of Strip Mining The
Despite its title, SMCRA''s provisions apply not only to surface mining, but also to the surface effects of underground mining. As a percentage of all coal mining, underground coal mining has been declining for many years, but in 2007 it still accounted for approximately 31 percent of coal mining, as compared with 69 percent surface mining.
Service EnterpriseMountaintop Mining Office of Surface Mining
The excess spoil must be placed in disposal sites adjacent to the mining pits in order to allow for efficient and economical coal extraction. Typical loions for excess spoil disposal sites are valleys, also known as headsofhollows or uppermost (headwater) stream reaches.
Service Enterprise4VAC25130816.71. Disposal of Excess Spoil General
Administrative Code. Table of Contents » Title 4. Conservation and Natural Resources » Agency 25. Department of Mines, Minerals and Energy » Chapter 130. Coal Surface Mining Reclamation Regulations » 4VAC25130816.71. Disposal of Excess Spoil General Requirements.
Service EnterpriseExcess Spoil, Coal Mine Waste, Diversions, and vLex
SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSMRE or OSM), are amending our regulations concerning stream buffer zones, streamchannel diversions, excess spoil, and coal mine waste to comply with an order issued by the U.S. District Court for the District of Columbia on February 20, 2014, which vaed the stream
Service EnterpriseChapter 2: The Environmental Effects of Strip Mining THE
THE ENVIRONMENTAL EFFECTS OF STRIP MINING A contour miners must dispose of their excess spoil in another fill or disposal area. The most common disposal areas percent surface mining.[13] An underground coal mine usually begins much like a contour mine, with a cut into The, .
Service Enterprise30 CFR 715.15 Disposal of excess spoil. govregs
All surface coal mining and reclamation operations conducted on lands where any element of the operations is regulated by a State shall comply with the initial performance standards of this part according to the time schedule specified in § 710.11. Disposal of excess spoil from an upper actively mined bench to a lower preexisting bench by
Service EnterpriseSurface Mining Commission Chapter 880X10D ALABAMA
ALABAMA SURFACE MINING COMMISSION ADMINISTRATIVE CODE CHAPTER 880X10D PERFORMANCE STANDARDS 880X10D.33 Disposal Of Excess Spoil And Underground Development Waste And Excess Spoil: Chapter 880X10D Surface Mining Commission Supp. 3/31/13 10D4 (b) Be of a uniform design throughout the operation
Service EnterpriseNovember 21, 2007 Re: Proposed Rule for Excess Spoil, Coal
response to the Office of Surface Mining''s (OSM) proposed rule to clarify the stream buffer zone rule and to revise the rules for the placement of excess spoil and coal mine waste associated with surface and underground coal mining operations under the Surface Mining Control and
Service EnterpriseCoal mining Wikipedia
Coal mining can result in a number of adverse effects on the environment. Surface mining of coal completely eliminates existing vegetation, destroys the genetic soil profile, displaces or destroys wildlife and habitat, degrades air quality, alters current land uses, and to some extent permanently changes the general topography of the area mined.
Service EnterpriseTexas Administrative Code texreg.sos.state.tx
Disposal of Excess Spoil: Valley Fills 䅈.365: Disposal of Excess Spoil: HeadofHollow Fills 䅈.366: Disposal of Excess Spoil: Durable Rock Fills 䅈.367: Protection of Underground Mining 䅈.368: Coal Processing Waste Banks: General Requirements 䅈.369: Coal Processing Waste Banks: Site Inspection 䅈.370: Coal Processing Waste Banks
Service Enterprise4VAC25130817.74. Disposal of Excess Spoil Preexisting
Administrative Code. Table of Contents » Title 4. Conservation and Natural Resources » Agency 25. Department of Mines, Minerals and Energy » Chapter 130. Coal Surface Mining Reclamation Regulations » 4VAC25130817.74. Disposal of Excess Spoil Preexisting Benches.
Service EnterpriseFINAL AOC GUIDANCE DOCUMENT WV Department of
02/19/04 FINAL AOC GUIDANCE DOCUMENT Page 6 2.3.2 Total Spoil Material (TSM) Total spoil material is all of the overburden and interburden that must be handled as a result of the proposed mining operation. TSM will either be placed in the mined area, in excess spoil disposal sites
Service Enterprise4VAC25130816.71. Disposal of Excess Spoil General
Administrative Code. Table of Contents » Title 4. Conservation and Natural Resources » Agency 25. Department of Mines, Minerals and Energy » Chapter 130. Coal Surface Mining Reclamation Regulations » 4VAC25130816.71. Disposal of Excess Spoil General Requirements.
Service EnterpriseMemoranda of Understanding: Surface Coal Mining Section
Sep 15, 2016 · Surface coal mining operations whose associated excess spoil fills in waters of the U.S. are determined to have minimal individual and cumulative adverse effects are subject to authorization under a CWA General permit issued by the COE.
Service EnterpriseOffice of Surface Mining To Issue New Rule Tightening
Office of Surface Mining To Issue New Rule Tightening Restrictions on Excess Spoil, Coal Mine Waste, and Mining Activities in or Near Streams (Washington) – The Office of Surface Mining Reclamation and Enforcement (OSM) announced today its plans to publish a new Federal rule that places new restrictions on how coal mine operators can dispose
Service EnterpriseFederal Register :: Excess Spoil, Coal Mine Waste
We, the Office of Surface Mining Reclamation and Enforcement (OSMRE or OSM), are amending our regulations concerning stream buffer zones, streamchannel diversions, excess spoil, and coal mine waste to comply with an order issued by the U.S. District Court for the District of Columbia on February
Service Enterprise4VAC25130816.71. Disposal of Excess Spoil General
Administrative Code. Table of Contents » Title 4. Conservation and Natural Resources » Agency 25. Department of Mines, Minerals and Energy » Chapter 130. Coal Surface Mining Reclamation Regulations » 4VAC25130816.71. Disposal of Excess Spoil General Requirements.
Service EnterpriseDate: April 21, 1998 eec.ky.gov
activity, underground mine faceup areas, coal refuse piles or excess spoil disposal areas, coal preparation plants or coal loadout facilities, access roads, sediment control structures, and landslides or mine spoil pushed off the mine bench and loed below the coal seam outcrop.
Service EnterpriseDDraraggline line MMethods ethods Ouro Mining Inc
Joe Hughes of Northeast Mining Company operated a 4 yard Page near Beaver Creek in Tucker County in 1963 During late 1960''s and 1970''s several operations including: Imperial Coal & Construction Co. Grant County Coal Corp. L Byron Construction Company Bitner Mining Island Creek Coal
Service EnterpriseGCC ENERGY, LLC KING II MINE OFFICE OF SURFACE MINING
5.6.1 785.19 Surface coal mining and reclamation operations on areas or adjacent to areas including alluvial valley floors in the arid and semiarid areas west of the 100th meridian.
Service EnterpriseSpoil tip Wikipedia
A spoil tip (also called a boney pile, gob pile or culm bank) is a pile built of accumulated spoil – waste material removed during mining. These waste materials are typically composed of shale, as well as smaller quantities of carboniferous sandstone and various other residues. Spoil tips are not formed of slag, but in some areas they are referred to as slag heaps.
Service EnterpriseGCC ENERGY, LLC KING II MINE OFFICE OF SURFACE MINING
5.6.1 785.19 Surface coal mining and reclamation operations on areas or adjacent to areas including alluvial valley floors in the arid and semiarid areas west of the 100th meridian.
Service EnterpriseBasic Information about Surface Coal Mining in Appalachia
In some cases underground mining also produces enough spoil to require the construction of valley fills. Mountaintop and area mining allows for almost complete recovery of coal seams, and reduces the number of workers required to a fraction of what conventional methods require but produces large volumes of excess spoil disposal needs.
Service EnterpriseSurface Mining Glossary Flashcards Quizlet
Start studying Surface Mining Glossary. Learn vocabulary, terms, and more with flashcards, games, and other study tools. excess spoil. spoil disposed of outside a minedout area. surface deposit of coal mine waste that does not impound water, slurry or any other liquid or semiliquid material.
Service EnterpriseAlaska Surface Coal Mining Program
391. Disposal of excess spoil or coal mine waste 393. Protection of underground mining 395. Coal mine waste, general requirements 397. Disposal area inspections 399. Hazardous coal processing waste, water control measures 401. Coal mine waste, refuse piles 403. Coal mine waste, fires 405. Burned waste removal 407. Coal mine waste, dams and
Service Enterprise30 CFR § 816.71 Disposal of excess spoil: General
§ 816.71 Disposal of excess spoil: General requirements. (a) Where excess durable rock spoil is placed in single or multiple lifts such that the underdrain system is constructed simultaneously with excess spoil placement by the natural segregation of dumped materials, Coal mine waste.
Service EnterpriseKentucky Adminstrative Regulations
130 Disposal of excess spoil 140 Disposal of coal mine waste 150 Disposal of noncoal mine waste 160 Coal mine waste dams and impoundments 170 Stabilization of surface areas 180 Protection of fish, wildlife, and related environmental values 190 Backfilling and grading 200 Revegetation 210 Postmining land use capability 210reg Postmining
Service Enterprisedisposal, spoil from coal mining, in surface landfill
Ecoinvent waste management others disposal spoil from lignite mining in surface landfill LCI GLO kg: Surface mining: Fugitive emissions from mining: Ecoinvent waste management sanitary landfill disposal hard coal ash from stove 0 water to sanitary landfill LCI CH kg
Service Enterprise30 CFR § 816.71 Disposal of excess spoil: General
§ 816.71 Disposal of excess spoil: General requirements. (a) Where excess durable rock spoil is placed in single or multiple lifts such that the underdrain system is constructed simultaneously with excess spoil placement by the natural segregation of dumped materials, Coal mine waste.
Service EnterpriseCoal mining Wikipedia
Coal mining can result in a number of adverse effects on the environment. Surface mining of coal completely eliminates existing vegetation, destroys the genetic soil profile, displaces or destroys wildlife and habitat, degrades air quality, alters current land uses, and to some extent permanently changes the general topography of the area mined.
Service EnterpriseMine Permits and Mine Reclamation and Enforcement
110 Surface and groundwater monitoring 120 Use of explosives 130 Disposal of excess spoil 140 Disposal of coal mine waste 150 Disposal of noncoal mine waste 160 Coal mine waste dams and impoundments 170 Stabilization of surface areas 180 Protection of fish, wildlife, and related environmental values 190 Backfilling and grading 200
Service EnterpriseGAO10206 Surface Coal Mining: Financial Assurances for
SURFACE COAL MINING Financial Assurances for, and LongTerm Concerning the Creation and Disposal of Excess Spoil and Coal Mine Waste and Stream Buffer Zones, OSMEIS34 (2008). previous administration modified the rule to allow a surface coal mine operator to place excess spoil material excavated by the operation into streams if the
Service EnterpriseSECTION 12.153. Disposal of Excess Spoil, DIVISION 6
SUBCHAPTER G. SURFACE COAL MINING AND RECLAMATION OPERATIONS, PERMITS, AND COAL EXPLORATION PROCEDURES SYSTEMS: DIVISION 6. SURFACE MINING PERMIT APPLICATIONSMINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN SECTION 12.153. under 䅈.363 of this title (relating to Disposal of Excess Spoil: General
Service Enterprisedisposal of excess spoil from coal mining and surface mining
osm announces final environmental mining. america''s office of surface mining reclamation and enforcement (osm) has announced the availability of the final environmental impact statement (feis) evaluating potential changes to the excess spoil and coal mine waste disposal rules as well as the stream buffer zone rule.
Service Enterprise
Random links
- types of crushers ppt
- quarry jaw crushing equipment sale in kenya
- stone crusher blade 250x400
- Iballast crushing machine dealers in uae
- machinery required for pulses milling
- products detail information copper crusher plant
- cost of italian barite processing plants
- soda water bottle shrink sleeve labeling machine
- para chile chancadora y molino
- gold processing plant from india
- double boiler in russia use for winery
- iron ore vertical mill
- Philrice Hammer Mill
- duties and responsibilities of rock crusher operator
- gallery for conveyor
- mechanical design
- videos youtube miami suand machine
- SBM xr400s jaw crusher
- small concrete crushing equipment
- gold elution plant manufacturers china